← Back to productsFlagship product

Flange Connection System

The Lin Sing flange connection system complies in full with DW144 and has been independently tested to the DW/TM1 procedure by Ir HN Lam of the University of Hong Kong. Four profiles across three sizes cover joint classifications J2 to J5 and Pressure Classes A, B and C.

DW144DW/TM1J2 – J5Class A · B · C
HLGDuct wallFlange profileGasketDrive clip
Flange joint — schematic section

Profile dimensions

Table A
Flange profiles LS2 – LS5
ModelNominal sizeGaugeHLG
LS225 mm————
LS330 mm————
LS440 mm1.0 mm———
LS540 mm1.2 mm———

Four profiles, three nominal sizes. LS4 and LS5 share the 40 mm nominal size and differ in gauge — 1.0 mm and 1.2 mm respectively.

Test results

Table B

Independently tested by Ir HN Lam, The University of Hong Kong, to the DW/TM1 procedure.

Joint classification × pressure class
Joint classPressure Class APressure Class BPressure Class C
J2———
J3———
J4———
J5———

Detailed test figures are governed by the University of Hong Kong DW/TM1 test report. A copy is available on request.

Corner pieces

Table C
ModelFor profileThicknessLength
LS20CLS2——
LS30CLS3——
LS40CLS4 / LS5——

Fabrication sequence

Six steps
01

Cut the profile

Cut flange profile to duct edge length, four pieces per joint.

02

Assemble the frame

Arrange the four lengths into a rectangular frame ready for corner pieces.

03

Insert corner pieces

Insert the matching corner piece (LS20C / LS30C / LS40C) at each of the four corners.

04

Fit to duct

Slide the assembled frame onto the duct end and align to the duct wall.

05

Spot weld or rivet

Spot weld or rivet along the duct wall to lock the flange to the duct.

06

Seal

Apply sealant to the inside face. The joint is then ready for site installation.

Site installation

On site
  1. 01

    Overlap gasket by 30 mm

    Gasket ends must overlap by at least 30 mm — do not butt-joint.

  2. 02

    Reinforce corners above 1000 Pa

    Where system pressure exceeds 1000 Pa, add supplementary corner bolts.

  3. 03

    Hand-tighten bolts first

    Hand-tighten all bolts and confirm alignment on all four sides before driving the clips.

  4. 04

    Clip driving sequence

    Drive clips from the centre outwards to distribute clamping pressure evenly.

Downloads

Documents
  • Flange system specification (PDF)Available on request
  • DW/TM1 test reportAvailable on request
  • CAD section file (DWG)Available on request

Related projects

Reference
2014–2015

尖沙咀新世界中心H2

Retail & Malls · Kowloon

2021–2022

航天城A3區

Airport · Outlying Islands

2022–2025

聯合醫院

Healthcare · Kowloon

View all 361 projectsRequest a quote

ProductFlange system
ProfilesLS2 – LS5
Joint classJ2 – J5
Tested toDW/TM1